Compatible Systems MicroRouter 900i Manual de usuario Pagina 42

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 94
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 41
42 - Work Holding - Section 6 Microrouter CNC Machine User's Manual
Engineers
square.
6: Assembling the Work Holding Clamp Rails
To fit the clamp rails in the Microrouter working area:
1) Position the clamp rails inside the machine, between the front
and rear X axis sliderail frames. Align the clamp rails at right
angles to the X axis sliderail frames.
Front X axis
sliderail frame.
Rear X axis
sliderail frame.
Clamp
rails.
2) Slide the bottom U shaped section of the clamp rail assembly
onto both the front and rear X axis sliderail frames, using the two
slots cut into the channel ends. Align the clamp rail so the
outermost allen bolts are positioned over the X axis sliderail
frames.
3) Check the clamp rails lie at
right angles to the X axis
sliderail frames using an
engineers square. Using a
5mm allen key, tighten the
outermost allen bolts
(turning clockwise, when
viewed from above) to lock
the bottom U shaped
sections to X axis sliderail
frame.
X axis
sliderail
frame.
Top U shaped
section of
clamp rail.
Bottom U
shaped section
of clamp rail.
Outermost allen
bolt locks bottom
U shaped section
to X axis sliderail
frame.
Turn 5mm
allen key
clockwise to
tighten bolt.
Vista de pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 93 94

Comentarios a estos manuales

Sin comentarios